Bouncy Energy Development
Four in-house tools that take a battery site from a plot of land to a documented layout, a grading plan, a noise assessment and a visibility study. They run on shared site data, so the answers stay consistent from early screening to permit material.
Each tool also works on its own. Every analysis is delivered as maps and a report, with the underlying data as shapefiles and rasters you can reuse in your own projects.
Levelled platform in sloping terrain, with cut and fill volumes.
Terrain and earthworks
Finds the platform level and slope that fits your plot and balances cut against fill, so less soil leaves or enters the site. Elevation data is fetched automatically from the national elevation model.
Why it matters: on sloping or rocky plots, earthworks can add real cost and decide whether a site is viable. A first volume estimate lets you compare plots early.
Units placed inside the site boundary, with the transformer and access kept clear.
BESS layout
Generates a complete battery site layout inside your plot boundary from the equipment you choose.
Why it matters: early layouts decide how much MW and MWh a plot can hold, and they are the base for grading, noise and visibility.
Visibility from the facility across terrain and tree cover.
Visibility analysis
Maps where a battery facility can be seen from, using a surface model that includes forest. Run it for summer and winter to show how leaf cover changes what neighbours and passers-by see.
Why it matters: visual impact is a common question from authorities and neighbours. A clear map answers it early.
Sound spreading from the facility towards the nearest dwelling.
Environmental noise
Calculates sound levels around a battery site based on the ISO 9613-2 method, with terrain taken into account.
Why it matters: noise is often the limiting factor for where a battery can be built. Knowing early helps you separate good projects from bad ones.
Tool descriptions are summaries. Scope and deliverables are agreed per project.